EMC certification E20-017 exams has become more and more popular in the fiercely competitive IT industry. Although more and more people sign up to attend this examination of, the official did not reduce its difficulty and it is still difficult to pass the exam. After all, this is an authoritative test to inspect the computer professional knowledge and information technology ability. In order to pass the EMC certification E20-017 exam, generally, many people need to spend a lot of time and effort to review.

There a galaxy of talents in the 21st century, but professional IT talents not so many. Society need a large number of professional IT talents. Now IT certification exam is one of the methods to inspect the employees' ability, but it is not so easy to is one of the way to IT certification exams. Generally, people who participate in the IT certification exam should choose a specific training course, and so choosing a good training course is the guarantee of success. ITCertKing's training course has a high quality, which its practice questions have 95% similarity with real examination. If you use ITCertKing's product to do some simulation test, you can 100% pass your first time to attend IT certification exam.

Exam Code: E20-017
Exam Name: EMC (Information Availability Design Specialist Exam for Data Center Architects)
One year free update, No help, Full refund!
Total Q&A: 108 Questions and Answers
Last Update: 2013-12-18

If you attend EMC certification E20-017 exams, your choosing ITCertKing is to choose success! I wish you good luck.

With ITCertKing's EMC E20-017 exam training materials, you can get the latest EMC E20-017 exam questions and answers. It can make you pass the EMC E20-017 exam. EMC E20-017 exam certification can help you to develop your career. ITCertKing's EMC E20-017 exam training materials is ensure that you fully understand the questions and issues behind the concept. t can help you pass the exam easily.

E20-017 Free Demo Download: http://www.itcertking.com/E20-017_exam.html

NO.1 A company has a shared pre-staged infrastructure at an alternate site. This approach enables the
company to rebuild systems and applications in the event of a disaster.
What is the term for this strategy?
A. Hot site
B. Manual failover site
C. Cold site
D. Warm site
Answer: A

EMC   E20-017 test questions   E20-017 certification training   E20-017   E20-017 exam simulations

NO.2 In the context of "establishing information availability," what is an operation management activity?
A. Capacity planning
B. Data classification
C. Testing
D. Implementation planning
Answer: A

EMC exam prep   E20-017   E20-017   E20-017   E20-017 exam dumps

NO.3 As represented in the exhibit, a company has a system with three critical components.
Each component must be functioning for the system to be operational. SLAs have been established
between the business and IT that define normal hours of operations for service as 8 A.M. - 8 P.M.,
Monday through Friday.
What is the availability (percentage) of Component 1?
A. 78
B. 81.7
C. 89
D. 91.7
Answer: B

EMC test   E20-017   E20-017 practice test   E20-017 test answers   E20-017 exam

NO.4 The exhibit represents a Component Failure Impact Analysis (CFIA) for a company's IT infrastructure.
Several Requests for Change (RFC) were raised.
Which RFC should be considered a priority for implementation?
A. Deploying a switch architecture with no single point of failure
B. Clustering the backup server with multiple storage devices
C. Configuring the NAS device in an active-active mode
D. Adding more disk drives to the storage array
Answer: A

EMC test   E20-017 demo   E20-017 braindump   E20-017 questions   E20-017

NO.5 In which focus area of the Information Availability Design Framework can seamless movement of data
between tiers of storage be found?
A. Automate
B. Create Copies
C. Distribute
D. Store
Answer: A

EMC test questions   E20-017 pdf   E20-017 study guide   E20-017

NO.6 A company has estimated a cost of $240,000 to build its new data center. The new data center will
serve an additional 20,000 clients for which the company will gain $35,000 per month. In addition, the
company has agreed to spend $2,000 every month in support costs.
In order to achieve a break-even point, what is the minimum time period the data center must be
operational?
A. 8 months
B. 9 months
C. 10 months
D. 11 months
Answer: A

EMC   E20-017 practice test   E20-017 dumps

NO.7 A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL,
the company spends $300,000 for the hardware costs and $60,000 for the implementation charges. Once
the data is migrated from the physical tape library to the VTL, the physical tape library will be
decommissioned for a cost of $50,000. The company will gain $60,000 per month due to this VTL
implementation.
What is the return on investment (ROI) in one year and the break-even point for the company ¯:s initial
investment?
A. 35%; Month 6
B. 35%; Month 7
C. 76%; Month 6
D. 76%; Month 7
Answer: D

EMC answers real questions   E20-017 practice test   E20-017   E20-017   E20-017 dumps

NO.8 A company has estimated a cost of $220,000 to build its new data center. The new data center will
serve an additional 20,000 clients for which the company will gain $30,000 per month. In addition, the
company has agreed to spend $1,000 every month in support costs.
In order to achieve a break-even point, what is the minimum time period the data center must be
operational?
A. 8 months
B. 9 months
C. 10 months
D. 11 months
Answer: A

EMC braindump   E20-017 exam   E20-017   E20-017 test questions

NO.9 The exhibit represents the expected financial results of a storage technology investment.
What does the ® ¯: represent?
A. Cost of investment equals the gain from the investment
B. Asset exceeds liability
C. Deployment cost crosses the planned deployment time
D. Return on investment
Answer: A

EMC test   E20-017 certification training   E20-017

NO.10 Based on strategic plans regarding green initiatives, an IT department is considering server
consolidation in its data centers.
Which set of elements should be included in the business value analysis to maximize the ROI for such an
initiative?
A. Asset utilization, recovery of stranded assets, and cost of floor space and power
B. Productivity of staff, response to business conditions, and utilization of storage
C. Asset utilization, backup costs, and need for availability
D. Cost of floor space and power, FTE-managed TB of storage, and reduction in SLA penalties
Answer: A

EMC test answers   E20-017 braindump   E20-017 certification   E20-017 pdf   E20-017

NO.11 A company's IT department is comparing two technology proposals. Option 1 would retain legacy
equipment while Option 2 would replace the existing equipment with a new one.
Option 1:
-Total operation costs = $400,000 per year -Annual storage requirements = $100,000 per year
Option 2:
-Initial investment = $1,250,000 -Recurring annual operation costs = $150,000 per year -Annual storage
requirements = $100,000 per year
The company's write-off costs for the legacy equipment is $50,000. As a business analyst using a TCO
analysis, which option would you recommend?
A. Option 1 is feasible if the project lifespan is less than 5 years
B. Option 1 is feasible if the project lifespan is more than 6 years
C. Options 1 and 2 are feasible if the project lifespan is 5 years
D. Option 2 is feasible if the project lifespan is less than 5 years
Answer: A

EMC   E20-017 study guide   E20-017 test answers   E20-017   E20-017

NO.12 As represented in the exhibit, a company has a system with three critical components. Each component
must be functioning for the system to be operational.
What is the scheduled availability (percentage) for the system?
A. 84
B. 86
C. 88
D. 90
Answer: C

EMC   E20-017 demo   E20-017   E20-017   E20-017 braindump

NO.13 A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL,
the company spends $300,000 for the hardware costs and $50,000 for the implementation charges.
Once the data is migrated from the physical tape library to the VTL, the physical tape library will be
decommissioned for a cost of $50,000. The company will gain $70,000 per month due to this VTL
implementation.
What is the return on investment (ROI) in one year and the break-even point for the company ¯:s initial
investment?
A. 85%; Month 8
B. 85%; Month 9
C. 110%; Month 6
D. 110%; Month 8
Answer: C

EMC   E20-017 certification   E20-017

NO.14 A company has a system with three critical components as represented in the exhibit.
Each component must be functioning for the system to be operational. Following an outage, certain
components seem to take longer to restore back to service than others.
What is the mean time to repair (MTTR) for Component 3?
A. 2 hours
B. 3 hours
C. 5 hours
D. 10 hours
Answer: C

EMC   E20-017   E20-017   E20-017   E20-017 exam dumps

NO.15 In which focus area of the Information Availability Design Framework can platform integrity be found?
A. Store
B. Automate
C. Create copies
D. Distribute
Answer: A

EMC   E20-017   E20-017

ITCertKing offer the latest MB3-700 exam material and high-quality 1Y0-A28 pdf questions & answers. Our JN0-533 VCE testing engine and LOT-442 study guide can help you pass the real exam. High-quality 000-196 dumps training materials can 100% guarantee you pass the exam faster and easier. Pass the exam to obtain certification is so simple.